Assessing blast performance doesn’t end with the shot. BlastMetriX’s VolumeCalculator extends the same geometry-based precision beyond design, supporting post-blast evaluation for both bank material and muck heaps. It gives engineers a quantified view of material movement; the real measure of how a blast performed in the field.
Together, BlastPlanner and VolumeCalculator create a complete feedback loop. Engineers can review every stage of the process using 3D models, from initial bench conditions to post-blast terrain and the final muck pile. This shared, measurable geometry links planning, verification, and performance analysis into one reproducible workflow.
Aligned with 3GSM’s guiding principle — Reproducible design, objective analysis — this integration turns blast data into actionable insight, connecting design intent with measurable results.
From Geometry to Measurable Volume
The Volume feature in BlastPlanner turns the pre-blast 3D model and its drill pattern into a measurable blast-site volume. After generating or importing a drill pattern, the blast site volume can be calculated with a single click, determining breakage limits for each borehole and their intersection with the three-dimensional shape of the free surface at varying depths.
The algorithm produces reliable results for both regular and irregular drill patterns and can account for complex bench face geometries. It can also process angled or deviated boreholes and includes subdrilling in the calculation.
Results are calculated for the entire site, each row, and individual boreholes (Figure1). Visibility controls let engineers isolate specific rows or boreholes for inspection (Figures 2 and 3).





Built-in Checks and Warnings
Once a volume is calculated, BlastPlanner automatically runs geometric consistency checks. If limit criteria are exceeded or inconsistencies appear, the program posts warnings. These do not stop the calculation; they highlight potential issues before execution.
Areas showing inconsistencies are displayed in orange, and warnings highlight the affected region in red (Figure 4). Warnings are listed alongside each row and borehole, allowing engineers to trace, review, and correct problematic geometry before drilling or loading.

Linking Design and Results
An essential step in assessing blast performance objectively is the determination of the blasted volume. BlastMetriX’s VolumeCalculator supports post-blast evaluations by determining the actual muck-pile and bank volumes from 3D surveys taken after detonation and mucking (Figures 5 and 6). Comparing the designed bank volume from BlastPlanner with the measured muck-pile volume and bank volumes from VolumeCalculator establishes an objective link between design intent and field performance.


Benefits
- Reproducible, geometry-based volumes for each blast site, row, and borehole
- Automatic integrity checks and burden warnings to catch inconsistencies before drilling.
- Post-Blast Analysis: compare pre- and post-blast models to measure movement and muck-pile swell.
- Objective optimization: understand how the blast behaved, where it deviated from expectations, and how to adjust future designs.
Closing the Loop on Blast Performance
Volume calculation in BlastMetriX turns complex blast geometry into measurable data that engineers can trust. By combining pre-blast design and post-blast evaluation in one reproducible framework, it closes the gap between planning, execution, and performance — delivering the foundation for truly data-driven blasting.